Steel-mixed equipment foundation directly buried bolts. A successful construction of new technology requires a deviation of less than 2mm.
The main inclined shaft wellhead of the Gaolan Mine in the Gujiao Mine Area of ​​Shanxi Province, frame structure, independent foundation, 4 floors, construction area of ​​1400m2, volume of 1300m3, plane axis size of 18mx35m, height of 21.6m, a large equipment foundation, concrete strength grade C25, The volume is 20m3, which is the basis of the belt drive device of the main inclined shaft. The base height is -4.2m, sitting on the sand pebble layer, and the height of the bolt of the pre-embedded equipment is 73.4m on the ground.
According to the design requirements of the drawings, the leather bandwidth is 1 200mm, the design tension is 1208, the driving device includes the head roller, the driving roller, the funnel, etc.) The bolts include the M56 9 buried method, and the construction scheme of the secondary pouring concrete for the reserved holes is not allowed.
In response to the above situation, we conducted several research discussions. If the method of bolting alone is used, the design requirements cannot be met. If the steel is used for reinforcement, not only the bolt displacement will occur during the welding process, but also the overall displacement of the steel frame during the concrete pouring process, it is difficult to ensure the quality of the bolt. It may also cause a quality accident. After many arguments, the construction plan was finally determined as follows: the basic earthwork excavation, firstly construct the frame independent foundation and frame column to: 0.00, partially backfill the earthwork, then pour the foundation of the equipment, and add the retarder to the equipment foundation concrete. Implement a two-shift system for day and night construction. In order to reduce the heat of hydration, the slag Portland cement is used, and the concrete equipment foundation is applied to 71.6m at a time, that is, the bottom of the bolt is 20;m. In order to ensure that the construction joints are firmly combined, set the steel bars! 251000 two-way arrangement, buried in the concrete 50; m, leaving 50; m in the upper part, and pre-cut iron parts.
Vertical channel steel = 12 brackets, and channel steel. Beijing: China Building Industry Press, 1992, editor of Tongji University. Water treatment. Beijing: China Building Industry Press, 1998
Cold storage room fast door are used to industrial warehouse applications, our cold storage doors combine the latest technology, premium materials and design features to meet the demanding requirements of the cold storage industry. Available as a sliding, swing and vertical lift door, all Cold Guard doors incorporate a tough and thermally neutral fiberglass reinforced pultrusion framework, extruded plastic polymer casings and Non-CFC foamed-in place polyurethane core. We understand the conditions that cold storage doors must endure. Superior design methods and non-corrosive materials ensure that Cold Guard will perform and look good for years to come!
The advantages of cold storage fast room door
Excellent Insulation Properties
Save Money on Temperature Costs
A Variety of Cold Room Options
Temperature Control and Efficiency
One of the most important benefits of our cool room panels is passive temperature control.
Safety for You Too
Not only are our cold room panels very hygienic, they also allow for superior safety. Their low allergenic qualities and enhanced seismic performance will protect you while you`re at work.
Cold Storage Room Fast Door,Freezer Room Fast Door,Freezer Room Insulated Fast Door,Thick Curtain High Speed Door
Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.hfautodoors.com