Home decoration basic knowledge collection

>>> Links: Home improvement environmental key points

Inclusion of contracted materials: The meaning of a home improvement package is the purchase contract signed by the owner and the decoration company. The decoration company is responsible for the procurement of all construction materials and is responsible for the construction (generally not including the installation of equipment such as air conditioners, kitchen equipment, etc.).

Bao Qinggong: Bao Qinggong means that the owner and the decoration company signed the content of the construction contract, the decoration company is only responsible for the construction, all the construction materials are purchased by the owners themselves.

Contracting materials: Contracting materials refers to the engineering contracting method signed between the owner and the decoration company. The decoration company is responsible for the construction and is responsible for the procurement of a part of the construction auxiliary materials. The owner is responsible for the procurement of the main materials.

Clear oil: Clear oil means that the surface finish of engineering wood products is finished with varnish, and the wood grain of wood products can be clearly seen after the finish is finished.

Contaminated oil: Contaminated oil means that the surface lacquer of the engineered wood product is finished with tempering paint, and the surface of the wood product is determined by the color of the paint used to determine the final effect.

Home decoration contract: At present, the Shanghai home improvement industry uses the “Home Interior Decoration Construction Contract” supervised by the Shanghai Municipal Bureau of Industry and Commerce. The contract stipulates payment methods for home decoration, standards used, phased acceptance, liability for breach of contract, mediation of disputes, material supply for Party A and B, completion acceptance, project settlement and warranty.

Design plan: The construction documents completed by the decoration company's designers according to customer requirements generally include design drawings, construction instructions, bills of materials, and project budgets.

Design Drawings: Design drawings for general home renovations should include plans, circuit diagrams, elevations (if needed), ceiling diagrams (if needed), and some detailed instructions. The elements of the drawings should include proportions, dimensions, material descriptions, and process practices.

Project budget: The project budget is the basis for the owner to investigate whether his project investment is in line with the expected project cost. A complete budget should include the total number of engineering projects, project quantities, unit prices, individual project costs, necessary explanations, and total prices.

Liability for breach of contract : Liability for breach of contract means that the parties to the contract did not complete the necessary work according to the contents of the contract. For example, the owner did not pay for the project in accordance with the prescribed time, or the decoration company did not complete the project according to the time stipulated in the contract and changed the construction materials without permission.

Standard: The home improvement project has relevant regulations on the quality of the project and the indoor air quality after the completion of the project. The quality of the home decoration project currently uses the “quality standard for home decoration project” or the “advanced decoration project according to the actual situation”. Quality Acceptance Assessment Standards". In terms of air quality, the "Civil Building Project Indoor Environmental Pollution Control Standard" or "Indoor Air Quality Standard" is currently used.

Environmental protection: The feeling of environmental protection in everyone's heart is that after the interior decoration project is completed, the indoor environment is subjected to air testing according to relevant standards, and the results are in compliance with the standards.

Covert projects: In home decoration projects, hidden projects refer to those projects that are not visible to the project later. For example, circuit reconstruction, waterway reconstruction, wood keel under solid wood flooring, wood keel construction of other woodworking projects, waterproofing works, etc.

Acceptance: Acceptance includes : acceptance of concealed works, inspection and acceptance of decorative works, acceptance of installation works, and completion acceptance of works. All stages of acceptance are based on the provisions of the contract, according to the relevant standards for the acceptance of the project.

Settlement: The settlement of a home improvement is a check and payment of the amount of work and the amount of completion of the work after completion acceptance of the project. For this phase of the work, it is necessary to calculate the amount of the project that should be settled based on the principles of overpayment, reduction, increase, and deduction, and finally pay the amount according to the amount of settlement money approved by both parties.

Warranty: According to the "House Interior Decoration Management Regulations" of the Ministry of Construction, starting May 1, 2002, the warranty period for residential interior decoration projects has clearly stipulated a minimum warranty period of two years.

Entrance decoration restaurant decoration decoration company interior decoration home decoration decoration design kitchen equipment decoration decoration project budget

Power Tools

comprehensive waterproof design, support work in rainy days

power tools, lithium battery wrench, vertical power wrench

Henan Idui Import and Export Trade Co., Ltd , https://www.acesunraylight.com

Posted on