Squats are things we touch every day in our lives, but few people know its installation method and installation height. So, how do you install a squatting pan? Here's a detailed introduction to how to install a squatting pan and a squatting pan. What is the installation height? I hope to be helpful.
First, the toilet installation method:
1. During operation, first bury the sewer pipe below the squatting pan and determine the distance between the entrance of the sewer pipe and the ground.
2. When operating, reserve the depth of the pit below the ground. Remember that the depth of the pit must be greater than the height of the toilet for later installation.
3. Plug the connected glue into the inlet of the squatting pan. When it is locked, apply a layer of glass glue or putty on the outer edge of the mouthpiece. Insert the inlet pipe into the hole so that the rubber plug seals well. Leaking water.
4. During operation, apply a layer of water outlet on the edge of the water outlet, and then screw it into the inlet of the sewer. Then use a coke residue or filler to set the squat pan horizontally.
5. After completion, open the faucet to perform a system test to see if there is a leak at the joint. If there is a leak, check the joints until the problem is resolved.
6. Finally, fill the squatting pan with the filling, and then fill the contact surface of the product with the grout with an elastic material such as bitumen or linoleum. The squat toilet is fixed with cement slurry, and then the floor tile is laid.
7. Try flushing again and use it if there is no abnormality.
Second, the installation height of the squatting pan :
First, there are two kinds of squatting pans, one with a bend and the other without a bend. The height of the bay is 32-40 cm, and the height without the bend is 16-20 cm. Therefore, its height should be determined according to the product, and the height of the sewer should be reserved. If there is a deviation in the height of the squat toilet, the height of the cement platform should not be less than 3 cm from the squat toilet and the squat toilet wall should be 3-5 cm thick. .
Third, the toilet installation Note:
1. Apply asphalt or linoleum to all the places where the slurry is in contact, otherwise the slurry will swell and break easily.
2. When dissolving bitumen, it should prevent the toilet from being heated and cause cracking.
3. Strictly follow the instructions to avoid cracking the toilet.
4. Avoid violent impact during installation.
The article concludes: How to install the squatting pan and how much the squatting pan is installed is introduced here. In fact, the installation of the toilet is very simple. Just follow the steps above, but be careful when operating. The toilet broke.
Running Man Exit Sign,Running Man Sign,Green Running Man Exit Sign,Running Man Emergency Light
NINGBO JIMING ELECTRIC APPLIANCE CO., LTD. , https://www.jimingemergencylight.com