There are many places to be noticed in the renovation of the new house, especially in the kitchen and toilet space. Even if the developer has a waterproof layer, we need to re-do the waterproofing before the renovation, so how to do a good bathroom, etc. What about waterproofing? Let's take a look at the new house bathroom as a waterproof step .
New house bathroom to do waterproof steps 1, preparation tools
Waterproof construction must be prepared before the construction tools and waterproof coating, which tools need to prepare the brush, scraper, roller brush, stirrer, etc., waterproof coating, then not only to choose non-toxic, odorless, environmentally friendly materials, its adhesiveness and waterproof Performance must also choose good job.
New house bathroom to do waterproof steps 2, leveling looking slope
The material is ready. It is necessary to clean the floor of the toilet first. It can be cleaned with the help of brushes, scrapers, shovels, etc. For some raised particles and floating dust, it is necessary to clean it up, and if the grassroots is not smooth. If it is used, there will be uneven thickness in construction and painting of waterproof material, resulting in poor waterproofing, cracking and leakage of the waterproof layer, so the ground needs to be leveled. The base of the bathroom also needs to find the slope, and a certain height difference can make the water flow more convenient.
New house bathroom to do waterproof steps 3, waterproof paint brushing
After the grass-roots processing is completed, the waterproof coating can be started. This can be used evenly according to the instructions for use. A lot of waterproof paints must be brushed at least twice and firstly brushed horizontally and then dry vertically. In particular, waterproof coatings such as polyurethane have a waterproof effect of 1.5 mm or more.
When brushing, drains, roots, corners, yin and yang angles, etc., should be painted first. The other areas should be painted first after brushing the facade. The shower area should be painted 180 centimeters. The bathtub should be painted. Up to 30 cm above the bath. The entire waterproof coating is required to be full, without omissions, with a firm bond, without cracks, bubbles, and falling off.
New house bathroom to do waterproof steps 4, shop protective layer
After the construction of the waterproof coating is completed, a protective layer needs to be laid on the surface to prevent the subsequent construction from being damaged, and the protective layer must completely cover the waterproof layer.
New house bathroom waterproof step 5, closed water test
After the waterproof coating has dried, the water-blocking test can be started for 48 hours and the waterproof effect can be verified. If there is no significant change in the highest point of the water level at 48 hours, it means that there is no leakage. If there is a drop of more than 2 cm, it means that there is leakage, and waterproof shall be done again.
Editor's Note: The above is the introduction of the waterproof steps for the new house bathroom . If you want to do a waterproof measure, every step in the construction must be carried out in strict accordance with the steps, so that there will be no problem. I hope the contents of Xiaobian can give you some references. If you want to learn more about decoration, you can pay attention to our website information.
New house bathroom waterproof steps