Today, many homes install kitchen cabinets when they decorate their kitchens. Because the overall kitchen cabinet storage function is powerful, the space utilization rate of the kitchen is greatly improved. However, after some cabinets are used for a period of time, problems such as loose cabinet doors may occur, which will greatly reduce the service life of the cabinets. In addition to the quality of the cabinets, panels, hardware and other materials, the installation and construction specifications can not be ignored.
Cabinet installation can be done after the kitchen wall tiles are laid and the kitchen ceiling is completed. The whole cabinet generally needs 15 to 30 days of custom cycle, and it takes 1 day to install the door. It is usually installed on the same day as the hood. Before the cabinets are arranged, the kitchen should be protected, and the cloth, kitchen wall, etc. should be cleaned to accurately measure the ground level. After the cabinet plates enter the site, the cabinets are assembled and moved into the kitchen. The positions are placed in the order of the drawings. In accordance with the construction specifications, in many cases, they are to be placed upside down, and then the feet are uniformly installed. The floor is covered with a protective material, and the cutting mouth is operated from the reverse side according to the size of the object, so as to ensure that the front side of the cabinet does not collapse. After the cabinet is assembled, adjust the level of the cabinet through the adjustment legs of the cabinet, and the error is plus or minus 1 mm. If there is a corner cabinet, the corner cabinet should be installed first. No corner cabinet should be installed from the cabinet against the wall.
Before installing the cabinet, first determine the distribution position of the wires and pipes in the wall, and adjust the height of the cabinet according to the height of the user. Draw a horizontal line. The distance between the horizontal line and the table is 650 mm. The user can adjust the height according to his height. The foreman proposed the adjustment of the distance between the cabinet and the cabinet to facilitate future use. The wall cabinet must be fixed on the wall surface, and no less than 2 fixed hanging code per 900 mm to meet the load bearing requirements. At the same time, the installation of the hanging code, for example, the positioning of the line, in turn, the eye hooks are fixed on the wall surface, and then the hanging cabinets are sequentially hung in order.
After the cabinet is leveled, a 25 mm thick countertop pad is installed on the top of the cabinet. The sides of the sink and the stove must be padded with a small amount of glass glue. At this stage, it is important to note that all the bolsters must be cut with a saw when cutting. The cutting and punching table tops are 3 mm larger than the actual size, and the corners are generally 25 mm arc-shaped. The sticky water tank is placed on the backing plate, and the gap between the table and the wall is kept at 3 to 5 mm.
When bonding the sink and the countertop, it is especially necessary to pay attention to the joint where the joint is glued with marble glue and then a layer of wax. In order to ensure that the glass glue is tightly bonded to the wall, it takes 1 to 2 hours for the glue to completely cure, and it is not allowed to be removed or moved at will. After the glue is cured, the excess part of the glue is smoothed with a sander.
When installing the cabinet hardware hinge, the height of all the door panels keeps the lower edge of the door panel level with the lower edge of the cabinet. After the door panel is leveled, all the hinges are covered with a hinge cover and operated with a boring cutter. The gap of the open door panel is maintained at 1.5 mm. between. Install the cabinet basin, faucet and basket. Install the hole in the installation. The diameter of the hole should be at least 3 to 4 mm larger than the pipe. After the hole is punched, the exposed cross section should be sealed with a sealing strip and the edge will be deformed by water. The hose and sewer should also be sealed with glass glue.
The installation of the embedded electrical appliances in the cabinet only needs to open the power supply hole on the spot, but the power supply hole cannot be opened too small to avoid disassembly in the future maintenance.
After the cabinet is installed, the site should be thoroughly cleaned, and all the wires should be in place, whether the door is leveled, and whether there are any remnants in the cabinet. The gap between the door and the frame, the door and the door, the drawer and the cabinet, the drawer and the door, the adjacent surface of the drawer and the drawer are less than or equal to 2 mm, and the user also needs to feel whether the floor cabinet and the hanging cabinet are comfortable in use. Finally, the skirting board is cut according to the length of the cabinet and fixed. If there is a corner, it must be fixed with a corner fitting. The entire installation step of the cabinet is a ring-and-loop, one of the steps is not standardized, it will affect the life of the cabinet, so it is sloppy.
Scan the QR code below, pay attention to the WeChat public number "Jiuzheng cabinet network"; you can view the popular article "I chose to sell cabinets that year!", I want to communicate with my peers to join the Jiuzheng Building Materials Network cabinet group 】
The welding contact tip is also the important parts in the mig welding torch.
We have contact tips compatible for BZL,PANA,BND,TWC,TRE etc.
Another significant things is the contact tip is made of two differernt material with different Durable life and prices .The E-Cu and the CuCrZr .The custom can choice according themselves.
If customer can provide us the drawing of mig welding contact tips, we can produce for you.
M6*25 Contact Tips, M6*45 Contact Tips,403-20-35 Contact Tips,M8*30 Contact Tips, 14H Contact Tips
EDAWELD COMPANY LIMITED , https://www.jsedaweld.com