In the decoration of family homes, disputes over water supply and drainage pipes account for a large proportion of quality complaints. The only way is to strictly follow the process requirements to ensure the quality of the project.
After the completion of the project, the industry is mainly responsible for acceptance. After passing the inspection, it can enter the next process to continue operations. Therefore, the owner must understand this knowledge.
Clean Water Pipe White Butterfly Water Pipe
If there is a quality problem in the water supply and drainage pipeline project, there may not be water leakage at that time, but it will take a long time, and it will undergo cold and heat expansion and water pressure. The pipeline will leak or even burst, causing serious consequences. Such an instance is not an isolated phenomenon. Therefore, the Shanghai local standard “Residential Decoration Acceptance Standard†imposes mandatory implementation of the engineering quality requirements for water supply and drainage pipeline construction. In other words, the water supply and drainage pipeline project must comply with the standard requirements. According to the standard requirements, the drain pipe should use rigid PVC drainage pipe and connectors. Should choose the manufacturer's name, brand, specifications and models of qualified products.
Don't go to a street shop to buy three products, because the plastic pipes look almost the same, but the quality is actually very different. Some companies add a large amount of waste to reduce costs, return materials, and greatly reduce product performance and life expectancy. The use of such pipes is equivalent to the time bombs being planted in the room. I do not know the day when the pipeline will suddenly burst and the water in the room will be full of people.
The water supply pipe shall be provided with exposed threads at its joints with a threaded connection. The pipe clamp shall be used for the timely installation of the water supply pipe. The connection between the pipe and the pipe fitting or valve shall be firm and shall not be loosened. After the pipeline is installed, check the water and check for leaks by visual inspection and feel. Check all the faucets, whether the valve is installed flat, whether the opening is flexible, whether the water is open and whether there is leakage. Check if the water meter is working properly.
After the above inspections are done, the pipeline can be closed for the next process. For special circumstances, special care must be taken to avoid causing future problems.
For example, the pipeline is very long, connecting the kitchen and the bathroom, or leading to the balcony. The pipeline must pass through the living room or the room. Since the pipeline is not buried in the wall or is laid under the floor, the consequences will be serious if there is a problem, so there should be no joints in the middle. And to properly enlarge the pipe diameter to avoid clogging. The hot water pipeline shall not use galvanized iron pipes to prevent the pipes from rusting and generating scale, and heat insulation measures shall be taken.
Links: Complex renovation construction to guard against 4 points to avoid regret
Construction acceptance room house home decoration decoration decoration living room bathroom door bathroom leak
It can be equipped with a scrolling display that displays 300-500 words of display content. It can also be equipped with intelligent infrared probe anti-collision device, which can automatically return to work when people or foreign objects are 20-30CM, thus ensuring the safety of vehicles and pedestrians.It can automatically open and close when automatic clutch is cut off. Manually open and close when manual clutch is cut off. The control system has control panel, push button switch, and other requirements. Equipped with wireless remote control.The door body is made of high-quality stainless steel and aluminum alloy profiles, and is hinged by the parallelogram principle. The drive is driven by special motor, worm and worm gear deceleration, and has automatic clutch or manual clutch.
Factory Sliding Retractable Gate,Aluminum Alloy School Sliding Gate,Automatic Electric Single Double Gate,Store Retractable Gate
Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.hffreezerdoor.com