In winter, the paving of wooden floors should pay special attention. If the indoor temperature is relatively high, the gap between the wooden floors should be as small as possible. On the contrary, if the indoor temperature is relatively low, the gap between the boards and the boards can be larger.
The wood is best placed in a room with heating equipment for 3 to 5 days to evaporate the moisture produced by the temperature changes, so that the moisture content of the wood is close to the level of the house, some of the accessories wood like wood keel, wood, gypsum board, etc. If the mold grows after being exposed to moisture and cracks and deforms, this should be avoided as much as possible.
The wood is best placed in a room with heating equipment for 3 to 5 days to evaporate the moisture produced by the temperature changes, so that the moisture content of the wood is close to the level of the house, some of the accessories wood like wood keel, wood, gypsum board, etc. If the mold grows after being exposed to moisture and cracks and deforms, this should be avoided as much as possible.
Nature floor del floor
Saw Electric Tool,Craftsman Utility Saw,Drywall Utility Saw,Table Saw General International
ZHOUSHAN CHUNLEI HACKSAW CO.,LTD , https://www.bailei.com